Time to obtain an electrical connection (days)

Last updated time
08/10/2026 02:00
||

Filters

Time to obtain an electrical connection (days)
Montenegro

Time to obtain an electrical connection (days)

20092023

Time to obtain an electrical connection by country in 2025 (time to obtain an electrical connection (days))

In 2025, Poland had the highest value (282.47) among 62 countries.

#CountryValueChange
1Poland282.47+1063.1%
1Lebanon (2019)235.86+321.3%
1Moldova (2024)219.12+120.2%
1Montenegro (2023)191.42+287.1%
1Syrian Arab Republic (2009)118.4–
1Bangladesh (2022)88.92+5.0%